End to end: an SOP changes
This page follows one real procedure from first upload to retraining. It shows how document control and learning work together. The example is a bottling plant's cleaning SOP.
The people
| Person | Role |
|---|---|
| Plant manager | Admin (also owner of the repository) |
| Quality author | Contributor in "Production SOPs" |
| Quality reviewer | Reviewer |
| Quality head | Approver |
| L&D trainer | Mentor (builds the course) |
| Operators | Learners in Plant A |
Part 1: Create and approve version 1
- 1RepositoryAdmin"Production SOPs", with the team added
- 2Add documentQuality author"Bottling line cleaning", SOP, audience Plant A
- 3SubmitQuality authorReviewer notified
- 4ReviewQuality reviewer"Checked against the line manual"
- 5ApproveQuality headA different person from the author
- 6ReleaseQuality headImpact: Acknowledge
- The Admin creates the Production SOPs repository and adds the team with their roles.
- The Quality author presses Add document: title, type SOP, audience Plant A, the file and a change note. It is version 1, Draft. They press Submit.
- The Quality reviewer is notified, reads it, and presses Review with a comment.
- The Quality head presses Approve, then Release with Acknowledge.
- Every operator in Plant A is notified (bell, email, phone) that a new document needs reading.
Part 2: People read it
Each operator opens Documents in Learn or the app, reads the SOP, and presses I have read and understood this. The Quality head opens Who has read it and sees, for example, 41 of 60 done, with the 19 names still to do it.
Part 3: Turn it into training
- The L&D trainer opens Studio → Courses, creates Bottling Line Safety, presses Add lesson, and picks the approved SOP (version 1) from the library.
- They add a quiz in Assessments, using AI generate on the SOP, then read and fix the draft questions before saving.
- They Publish the course and a manager presses Assign training for the operators, with a due date and Mandatory on.
The SOP's Used in list now shows "Bottling Line Safety".
Part 4: The SOP changes
A new caustic concentration check is needed.
- 1Upload new versionQuality authorVersion 2, change note says why
- 2Submit and reviewAuthor and reviewerThe reviewer sends it back once
- 3Fix and resubmitQuality authorTemperature corrected
- 4ApproveQuality head
- 5ReleaseQuality headImpact: Refresher training
- The Quality author opens the document and presses Upload new version. Version 2 starts as a Draft.
- They Submit. The reviewer presses Send back with a comment: "Step 6 temperature must be 75 to 80 C". The author fixes the file and presses Submit again. The reviewer comments Review: "Looks good".
- The Quality head presses Approve, then Release and chooses Refresher training.
Part 5: What the system does for you
On that release, automatically:
- Version 1 becomes Replaced. Version 2 is now the document's current version.
- Operators in Plant A are notified to read and acknowledge version 2.
- The course authors are notified that the SOP changed and the course needs updating.
- The course still teaches version 1. Nobody who has already completed it is changed. The Corp dashboard shows Courses needing an update: 1.
- The history is complete. Open the document's Detailed view to see version 2 branching from version 1, with every submit, comment, send-back, approval and release, who did it and when.
Part 6: Update the training
- The trainer opens the course, presses Add lesson and chooses version 2 of the SOP, then deletes the old lesson that used version 1.
- They update the quiz questions if needed and publish.
- They Assign training again to the people who must retrain. Their earlier results stay on record.
- Courses needing an update falls back to 0.
Part 7: The auditor arrives
Months later someone asks: *"What did operators know on 12 November, and who approved it?"*
- Audit Logs shows every action with who and when, with a link to the document's version history.
- The version history shows the exact version live on that date, and who approved it.
- Who has read it shows who acknowledged which version.
If something goes wrong
Version 2 turns out to be wrong. An Approver opens version 1 (now Replaced), presses Restore as draft, and gives a reason. A new draft, version 3, is created from the old file. It is reviewed, approved and released like any other. Or press Withdraw to take a version out of use. Nothing is ever deleted from the history.